Makassar smart city operation center priority optimization using fuzzy multi-criteria decision making

Kurniawan, Fachrul ORCID: https://orcid.org/0000-0002-3709-8764, Wibawa, Aji Prasetya, Munir, Munir, Nugroho, Supeno Mardi Susiki ORCID: https://orcid.org/0000-0001-8109-6136 and Hariadi, Mochamad (2017) Makassar smart city operation center priority optimization using fuzzy multi-criteria decision making. Presented at International Conference on Electrical Engineering, Computer Science and Informatics (EECSI) 2017, 19 -21 Sep 2017, Yogyakarta.

[img] Text
12354.pdf - Published Version
Restricted to Repository staff only

Download (375kB)

Abstract

The development of smart city operation room of Makassar possesses several equally important stages which are equally important. There are four stages of development that are 1) data center construction, 2) camera distribution around the city , 3) wall room monitoring construction, and 4) smart operation room architecture construction. Since the time and cost are limited, it forces the project manager to be able to manage and control the priority in conducting the project. There are several usable criteria to determine the priority in conducting the project development through criteria consideration of the entire project stages. Project priority optimization system aims at making every single project activity effective including its evaluation process. It also exposes a ranking illustration of foremost project priority by providing cost preference of the entire development stages. Fuzzy Multi-Criteria Decision-Making is used to illustrate the project priority rank and further to determine the alternative optimal option in conducting the project. This enforces particular project to allocate its cost to the project with a higher level of cost necessity. The company, therefore, enables to make effective funding for the entire project based on the level of importance and time achievement and subsequently it promotes accessible technology integration. The conducted experiment suggests that the first construction of the project is data center construction followed by wall room construction and CCTV distribution. This is relevant with optimization value result of data center 0,405 higher than A2 0,42 for wall room construction and A3 CCTV distribution 0,24.

Item Type: Conference (Paper)
Keywords: project optimization; smart operation room; main priority; fuzzy MCDM
Subjects: 08 INFORMATION AND COMPUTING SCIENCES > 0802 Computation Theory and Mathematics > 080201 Analysis of Algorithms and Complexity
08 INFORMATION AND COMPUTING SCIENCES > 0806 Information Systems > 080605 Decision Support and Group Support Systems
Divisions: Faculty of Technology > Department of Informatics Engineering
Depositing User: Fachrul Kurniawan
Date Deposited: 13 Dec 2022 15:17

Downloads

Downloads per month over past year

Origin of downloads

Actions (login required)

View Item View Item